Hotel, Leisure & Retail

Dovehouse Extra Care Facility

London SW3

  • Timescale
    16 Months
  • Structural Engineer
    Heyne Tillet Steel
  • Architect
    PDP London
  • Design & Build
    Substructure Works | Concrete Frame

Scope & Gallery

Our scope included piling, temporary works and excavation, below ground drainage and attenuation tank, basement construction, structural waterproofing and cavity drainage, concrete frame.

Take a look

Related projects